Featured Image Gallery for 2000
IRAC installed on MIC baseplate
(October 2000)
MIPS installed on MIC baseplate
(September 2000)
SIRTF Primary Mirror
(August 2000)
Last Look at the inside of MIPS
(July 2000)
IRS installed on MIC baseplate
(May 2000)
Preparing for Vibration Testing
(April 2000)
SIRTF Checked
(March 2000)
SIRTF Assembled
(March 2000)
SIRTF Mirror chart
(January 2000)
|